Construction site

Equipement 

Construction site characteristic
Client 

 Location

 Works done

Steam-water boiler house for the “Complex for producing and processing of poultry (turkey)” in Pervomayskiy district, Tambov region

Steam boilers ICI

Water boilers ICI

Joint burners Baltur

3х5TPH

2х3,5 МW

«Tambov Turkey»LLC (CHERKIZOVO GROUP) Pervomayskiy district,Tambov region Engineering, working-out of conceptual solution, fitting of basic equipment, delivery of basic equipment, designing, delivery of auxiliary equipment, installation, commissioning
Building of the plant-wide installation of water treatment for the “Complex for producing and processing of poultry (turkey)” in Pervomayskiy district, Tambov region HTE 100 m3/h «Tambov Turkey» LLC (CHERKIZOVO GROUP) Pervomayskiy district, Tambov region Engineering, working-out of conceptual solution, fitting of basic equipment, delivery of basic equipment, designing, delivery of auxiliary equipment, installation, commissioning

Technical re-equipping of the boiler house «Wimm-Bill-Dann»

Tsaritsyno» JSC,address: Moscow, 1st Warsaw proezd, 6.,with boiler installation BOSCH TypeUniversal UL-S, steam production 16 TPH

Steam boilers Buderus

Gas burners Saacke

1х16 TPH

«Wimm-Bill-Dann» LLC

TsaritsynoArea

PEPSICO RUSSIA

Moscow Engineering, working-out of conceptual solution, fitting of basic equipment, designing
Steam hot water boiler house for the project "Pig-breeding complex with a complete production cycle of 270 thousand pigs per year" and "Slaughterhouse with refrigerators" at Bezhetsk district, Tver region

Steam boilers Buderus

Hot water boilers Buderus

Joint burners Saacke

2х4+1x8TPH

1х6,5 МW

«Corall» LLC Bezhetsk Fitting of basic equipment, supply of basic equipment, designing, supply of auxiliary equipment, installation, commissioning
Steam hot water boiler house for the project "Pig-breeding complex with a complete production cycle of 270 thousand pigs per year" structural subdivision "Factory shop of animal feed " at Bezhetsk district, Tver region

Steam boilers Buderus

Hot water boilers Buderus

Gas burnersSaacke

2х2 TPH

2х1,85 МW

«Corall» LLC Bezhetsk Fitting of basic equipment, supply of basic equipment, designing, supply of auxiliary equipment, installation, commissioning
Hot water boiler house for the project "Pig-breeding complex with a complete production cycle of 270 thousand pigs per year" structural subdivision "АBК" at Bezhetsk district, Tver region

Hot water boilers Buderus

Joint burners Saacke

2х730 kW «Corall» LLC Bezhetsk Fitting of basic equipment, supply of basic equipment, designing, supply of auxiliary equipment, installation, commissioning
Technical re-equipping of the boiler station with installation of burners SAACKE

Rebuild boiler КВГМ-100

Oil-fired burners SAACKE

100 MW «Karel’skiy Okatysh» JSC (Division of mining and smelting company «SEVERSTAL») Kostomuksha Engineering, working-out of conceptual solution, fitting of basic equipment, delivery of basic equipment, designing, delivery of auxiliary equipment, installation, commissioning
Building of the steam hot water boiler house Complex for pig slaughter with capacity of 1529 thousand animals in a year and the Recovery subdivision in Tambov region within the frame ofcapital investment project «Building of the slaughter production with capacity of 1529 thousand animals in Tambov region».

Steam boilers Buderus

Hot water boilers Buderus

Joint burners Weishaupt

2x1,25 TPH 1х820kW

2х730 kW

Filial branchinTambov CJSC «Upravlenie po stroitel‘stvu № 111»

(GROUP OF COMPANIES RUSAGRO)

Tambov Engineering, working-out of conceptual solution, fitting of basic equipment, delivery of basic equipment, designing, delivery of auxiliary equipment, installation, commissioning
Construction of the plant's overall chemical water treatment plant for the needs of Complex for pig slaughter with capacity of 1529 thousand animals in a year and the Recovery subdivision in Tambov region within the frame of capital investment project «Building of the slaughter production with capacity of 1529 thousand animals in Tambov region». HTE 100 m3/h

Filial branch in Tambov CJSC «Upravlenie po stroitel‘stvu № 111»

(GROUP OF COMPANIES RUSAGRO)

Tambov Engineering, working-out of conceptual solution, fitting of basic equipment, delivery of basic equipment, designing, delivery of auxiliary equipment, installation, commissioning
Building of 3 hot water boiler houses in Tambov region within the frame of capital investment project «Building of the slaughter production with capacity of 1529 thousand animals in Tambov region».

Hot water boilers Buderus

2х38 kW, 2х73 kW, 2х135 kW

Filial branch in Tambov CJSC «Upravlenie po stroitel‘stvu № 111»

(GROUP OF COMPANIES RUSAGRO)

Tambov Engineering, working-out of conceptual solution, fitting of basic equipment, delivery of basic equipment, designing, delivery of auxiliary equipment, installation, commissioning
Technical re-equipping of the boiler station LLC «Kampina»

Steam boilers LOOS

Joint burners Weishaupt

8 TPH

«Kampina» LLC

(FrieslandCampina)

Stupino Engineering, working-out of conceptual solution, fitting of basic equipment, delivery of basic equipment, designing, delivery of auxiliary equipment, installation, commissioning
Technical re-equipping of the boiler station “SKIM” JSC

Steam boilers

ДКВР 10/13

30 TPH “SKIM” JSC Moscow Modernization of the gas area of the boiler house, changeover of boilers ДКВР to hot water mode. Engineering, working-out of conceptual solution, fitting of basic equipment, delivery of basic equipment, designing, delivery of auxiliary equipment, installation
Building of the steam-hot water boiler house for the needs of the factory of paper production «Pulp Invest» LLC

Buderus Logano S825L 3700 kW

LOOS UNIVERSAL Typ UL-SX 7 500 kg/h

7,4 МWand

7,5 TPH

«Pulp Invest» LLC Kazan Engineering, working-out of conceptual solution, fitting of basic equipment, delivery of basic equipment, designing, delivery of auxiliary equipment, installation, commissioning
Building of the overall chemical water treatment plant for the needs of the factory of paper production «Pulp Invest» LLC HTE 50 m3/h «Pulp Invest» LLC Kazan Engineering, working-out of conceptual solution, fitting of basic equipment, delivery of basic equipment, designing, delivery of auxiliary equipment, installation, commissioning
Building of the hot water boiler house for the needs of the warehouse complex of Ford service parts

2хUNICALL ELLPREX

970 kW

1хUNICALL ELLPREX 420                         Joint burners F.B.R.

2,36 МW «SFCardo» LLC Moscow Engineering, working-out of conceptual solution, fitting of basic equipment, delivery of basic equipment, designing
Steam boiler house in Kazan

Steam boilers LOOS

Gas burners Saacke

_ «Cotton Way» LLC Kazan Working out of evaluation of technical possibility of joining the steam consumer to the existing steam boiler

Co-generation plant for the needs of the housing estate

«Katushki-Ug», Lobnya, Moscow region

Jenbacher, Viessmann _ GK Morton Stupino

Working out of building strategy of

co-generation plant for the needs of the housing estate

«Katushki-Ug», Lobnya, Moscow region

Novokuybyshevsk

oil refinery

(НК «Rosneft»)

Hot water boilers LOOS

Joint burners SAACKE

4x 19,2 MW

Novokuybyshevsk

oil refinery

Novokuybyshevsk, Samara region

Engineering, fitting of basic equipment, delivery of basic equipment

Reconstruction of the

steam boiler plant

Agromilkplant

«Ryazansky»

Set:

steam boiler plant LOOS

Gas burners SAACKE

Smoke flue Н=38 m

Producing capacity 12 TPH

Agromilkplant

«Ryazansky» JSC

Ryazan

Engineering, working-out of conceptual solution, fitting of basic equipment, delivery of basic equipment, designing, installation, commissioning

Building of blocks № 14, 15 Novokuznetsk Gas-turbine Thermal Power Plant

Hot water boilers LOOS

Gas burners SAACKE

Thermal efficiency 24MW

«Sibirenergo-

engineering» CJSK

Novokuznetsk

Engineering, fitting of basic equipment, delivery of basic equipment, installation supervision, commissioning of the supplied equipment

Building of the steam boiler house of the plant Voronezhskie Drozhzhi «Lesaffre» (France)

Set:

steam boiler plant BUDERUS

Gas burners SAACKE

Producing capacity 20 TPH

«VoronezhskieDrozhzhi» JSC

(LESAFFRE Group(

Voronezh Engineering, fitting of basic equipment, delivery of basic equipment, installation supervision

Fitting up of the hot water boiler for the company

Grad Moskovsky

Boiler Loos UT-М

Burners Elco

Thermal efficiency 13,5 MW «RegionEnergoServis» CJSC Moscow region, Grad Moskovsky Engineering, working-out of conceptual solution, fitting of basic equipment, delivery, installation supervision

Modernization of the

steam boiler house «Radiopribor» JSC

Set:

Steam boiler plant BUDERUS Logano SHD 815, inkl.

Gas burner ELKO

Producing steam capacity 5 TPH «Radiopribor» CJSC Kazan Engineering, fitting of basic equipment, delivery of basic equipment, installation supervision, commissioning of the supplied equipment
Reconstruction of the steam boiler house of the plant «Coca-Cola», Saint Petersburg

Steam boilers LOOS

Gas burners Dreizler

Producing capacity 5 TPH «Coca-Cola HBC Evraziya» JCS Saint Petersburg Engineering, fitting of basic equipment, delivery of basic equipment, installation supervision
Power center for glass production «Sital» Cogeneration unit MWM

Electric power

4,4 MW

«Sital» JSC Bryansk Engineering, разработкапакетногорешения, delivery of   thecogeneration unit in container, installation supervision, startup

Аutomatic gas

boiler-house for the plant «Elektroapparat»

Hot water boilers

Viessmann Vitomax 300

Burners Elco

Thermal power

30 МW

«Sberegayuschie Energo Technologii» LLC Bryansk Engineering, working-out of conceptual solution, fitting of basic equipment, delivery of basic equipment, installation supervision, delivery of auxiliary equipment, installation supervision, startup, supervising

Аutomatic gas boiler-house with reserve fuel tank farm (diesel).

Heat supply of the technology park in regard to high tech

Boilers ASTEBO

Two-fuel burners SAACKE

Thermal power

152 МW

State Governmental institution of Nizhny Novgorod region

«Center for Regional Development»

Village Ankudinovka,

Nizhny Novgorod

Engineering, working-out of conceptual solution, fitting of basic equipment, delivery of basic equipment, installation supervision, installation supervision, startup, supervising
Reconstruction of the gas boiler plant with dismantling of old steam boilers and installation of new

Boiler ICI GX6000 10 TSH

Gas burner Saacke

Producing capacity 10 TPH

National food group

«Sady Pridon’ya»

Volgograd region, Gorodishchensky district, village Sady Pridonyya

Engineering, working-out of conceptual solution, fitting of basic equipment, delivery of basic equipment, installation supervision, delivery of auxiliary equipment, installation supervision, supervising

Аutomatic gas boiler-house for the heat supply settlement Sel‘co,

Bryansk region

Hot water boilers

Viessmann Vitomax 300

Burners Elco

Thermal power

30 МW

Bryansk Retail Company Settlement Sel‘co, Bryansk region Engineering, working-out of conceptual solution, fitting of basic equipment, delivery of basic equipment, installation supervision, startup